• Preparation of Single Line Diagram/Protection Single Line Diagram.
• Preparation of Trip Matrix and IO Signal list.
• Preparation of IEDs configuration files.
• Preparation of Panel and IEDs test procedure and test reports.
• Preparation of Test template files for each type of IEDs.
- Responsible for commissioning and troubleshooting of Bay level secondary equipment's
• Preparation of Protection and Control Panel schematics for Medium/High Voltage Substation.
• Preparation of Interlocking table and schematics for various Busbar configurations.
• Addressing the technical queries raised by the customer during the execution of a project, if required.
• Interaction with various cross-function teams like Primary, Project Management, and Production, when required.
• Self-reviewing the documents before submitting them to Lead Engineer.
• Generating Preliminary BOM by understanding the importance and consequences of releasing it.
• Understanding and preparation of Communication Architecture diagrams.
• Preparation of protection schematics (Trafo, Line, Busbar) when we've integrated protection in LCC . Selection of Bay Control Unit and other protection IEDs.
• Preparation of complete Digital Control & Protection drawings as part of Digital Substation (with NCITs, MU's, SAM600 modules, etc...).
• Adhering to applicable codes, practices, QA/QC policies, performance standards, and specifications.
• Living Hitachi Energy's core values safety and integrity, which means taking responsibility for your own actions while caring for your colleagues and the business.(empty)
Apply now
Current employees apply here