Senior Program Planner / Critical Path Scheduling / Grand Prairie, TX
- Grand Prairie, TX
Description:
Lockheed Martin Missiles and Fire Control (MFC) is one of four Lockheed Martin business areas. MFC is a recognized designer, developer and manufacturer of precision engagement aerospace and defense systems for the U.S. and allied militaries. MFC develops, manufactures and supports advanced combat, missile, rocket, manned and unmanned systems for military customers that include the U.S. Army, Navy, Air Force, Marine Corps, NASA and dozens of foreign allies.
Lockheed Martin offers a competitive benefits package, with generous 401k matching and flexible schedule options.
We are experiencing some substantial growth at our campus in Grand Prairie, Texas and looking to add qualified Program Planners to the team. In this exciting role you will be a trusted partner, supporting the preparation and maintenance of program schedules and plans.
In this role, your responsibilities will include:
-Develop Integrated Master Schedules for new or existing development programs from Program Summary Master Schedules.
-Maintain schedules, perform risk analysis, identify and resolve critical path issues and network logic conflicts.
-Support and participate in negotiations with customer.
-May work proposal preparation and assess the progress against established plans and parameters.
-Formulate and recommend corrective action measures such as schedule revisions, fund allocations, and work requirements.
-Maintain cost and schedule integration.
Relocation: Relocation assistance is possible for this exciting position.
The Locale: Grand Prairie is part of the "Mid-Cities" region in the Dallas-Fort Worth Metroplex which is in the North Central region of Texas. Grand Prairie is a suburb of both Dallas and Fort Worth. The region offers a great cost of living combined with a robust economy and a pleasant climate. This North Central region of Texas is a great place to live and to raise a family. The region is home to numerous colleges and universities to include University of Texas at Dallas, University of Texas at Arlington, University of North Texas, Southern Methodist University, and Texas Woman's University. The Mid-Cities is the suburban region filling the thirty-mile span between Dallas and Fort Worth. These communities include the cities of Arlington, Irving, Grand Prairie, Grapevine, Southlake, Colleyville, HEB (Hurst, Euless and Bedford), NRH (North Richland Hills and Richland Hills), Haltom City, Watauga, and Keller, along with multiple other smaller towns such as Trophy Club and Roanoke and together represent more people than either Dallas or Fort Worth.
Basic Qualifications:
-Bachelor's degree or equivalent experience/combined education
-Must be able to obtain a clearance
-Critical Path Scheduling methodology
-Proficiency in MS Office (specifically Excel and Power Point) and Microsoft Project experience
-Integrated Master Schedule (IMS) development and maintenance
Desired Skills:
- Six or more years of related experience with a Bachelor's degree or four or more years with a Master's degree
-WBS Development experience
-Earned Value Management experience
-Proposal development experience
-Integrated Master Plan (IMP)
-Advanced Excel skill set including macros, lookup tables and VBA
-Experience with the Schedule Risk Assessment process
BASIC QUALIFICATIONS:
job.Qualifications
Lockheed Martin is an Equal Opportunity/Affirmative Action Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, pregnancy, sexual orientation, gender identity, national origin, age, protected veteran status, or disability status.
Join us at Lockheed Martin, where your mission is ours. Our customers tackle the hardest missions. Those that demand extraordinary amounts of courage, resilience and precision. They're dangerous. Critical. Sometimes they even provide an opportunity to change the world and save lives. Those are the missions we care about.
As a leading technology innovation company, Lockheed Martin's vast team works with partners around the world to bring proven performance to our customers' toughest challenges. Lockheed Martin has employees based in many states throughout the U.S., and Internationally, with business locations in many nations and territories.
EXPERIENCE LEVEL:
Experienced Professional
Back to top